It is important to keep a number of factors in mind when designing a new building, including its strength, quality of materials, aesthetic appeal, functionality, energy efficiency, and environmental sustainability. To improve the durability of a structure, architects work on every aspect. Similarly when there is a talk about demolition, a complete analysis is necessary. In addition to natural or environmental causes, renovation needs, aging buildings, non compliance with government regulations, and others, there may be several reasons for demolishing the building. If the property can no longer be maintained or kept, it may be better to consider tearing it down.


Demolition work is basically straightforward but that doesn’t mean it is without risks. Demolition entails destroying, razing, or wrecking the structure partially or fully. Destroying any property can be dangerous if proper analysis is not done with adequate precautions. Just like Structural Design Software for designing assistance there are softwares for demolition planning also. With the help of these tools engineers analyze the complete situation and then implement the demolition process. Let us look at some major points engineer must keep in mind before beginning the demolition:


  1. The analysis must include wind and seismic analysis for structures located in wind- or earthquake prone areas to ensure they don't fail prematurely.

  2. Dust analysis is very important as the dust particles generated from demolition activity can be hazardous to the environment and a nuisance to the local community.

  3. Engineers must estimate the sound intensity in DB due to explosives in the process of demolition. Noise generated in demolition sites is a major concern for contractors, property owners, and the local community.

  4. With the help of protective design software, engineers can analyze the complete impact of blast, precautions needed, and can make progressive collapse designs.

  5. Engineers must make the predicted plan and compare the actual scenarios with the predicted for better understanding.

  6. Before you begin the demolition process, take the appropriate measures for asbestos removal or disposal.


There is more to demolition than implanting the explosives and breaking down the building. Demolition process can be dangerous, hence a proper demolition planning is required. Modern softwares can help engineers in planning and execution of plans. Applied Science is a quality software service provider for structural engineering.